3M Versaflo TR-300 / TR-600 Series

Preventive Maintenance Procedure

On this page

Asset Type

Powered Air-Purifying Respirator (PAPR)

Manufacturer

3M

Model

Versaflo TR-300 / TR-600 Series

Manual Reference

3M Versaflo TR-300, TR-300+, and TR-600 Series User Instructions; 3M Inspection, Cleaning, and Storage Procedures Technical Bulletin, August 2020 Revision 4; component-specific instructions.

Manufacturer Recommendation / AEM Status

3M instructs users to inspect the complete PAPR before each use and clean and inspect it after each use and before storage. Airflow and low-flow alarm checks are pre-use functions using the correct model-specific airflow indicator and instructions. Remove damaged, nonfunctional, or alarm-failing equipment from use.

For infrequently used TR-300 motor/blowers, run the motor for five minutes annually. Battery instructions differ by family and storage condition. Filter/cartridge replacement depends on exact configuration, condition, contamination, loading, service life, and the employer's change schedule; do not invent a universal interval. Changes belong under the employer's respiratory-protection program and facility-approved AEM, risk, maintenance, and infection-control processes.

What This PM Procedure Covers

Required Tools and Equipment

Step-by-Step PM Procedure

1. Verify Identification and Approved Configuration

Action: Record asset, exact TR-300/TR-300+ or TR-600 model, serial/lot, battery, filter/cartridge, prefilter/spark arrestor, cover, belt, tube, headgear, charger, and accessories. Verify the combination against 3M/NIOSH approval information.

Expected outcome: The system and authorized configuration are established.

2. Review History and Exposure

Action: Review alarms, airflow, runtime, charging, damage, contamination, cleaning, component changes, storage, recalls, and repairs. Identify the contaminant before disassembly.

Expected outcome: Hazards and unresolved performance issues are known.

3. Remove From Service and Decontaminate Safely

Action: Tag out the PAPR and follow employer exiting, decontamination, infection-control, and disposal procedures before handling exposed parts.

Expected outcome: Personnel and work areas are protected.

4. Disassemble for Inspection

Action: Detach belt, battery, tube, headgear, cover, filter/cartridge, and optional prefilter/spark arrestor per instructions. Do not open the blower housing; it has no user-serviceable internal parts.

Expected outcome: Accessible parts are separated without unauthorized disassembly.

5. Inspect Motor/Blower Housing

Action: Inspect housing and cover for cracks, holes, discoloration, chalking, softness, deformation, contamination under the filter, and damaged inlet/outlet features.

Expected outcome: Housing and cover are intact and clean.

6. Inspect Controls, Display, and Latches

Action: Inspect power switch, releases, battery latch, display, markings, and connections. At startup, confirm all applicable LED/display segments illuminate and remain visible.

Expected outcome: Controls, latches, and visual alarms are functional.

7. Inspect Filter, Cartridge, and Gaskets

Action: Check for damage, wetness, excessive loading, contamination, expired service life, or poor seating. Do not clean filter media. Apply the employer's cartridge change schedule.

Expected outcome: Only approved, serviceable filtration remains in use.

8. Inspect Prefilter and Spark Arrestor

Action: Check optional components for damage, loading, cleanliness, and correct installation. Replace non-cleanable/damaged parts and clean only as expressly permitted.

Expected outcome: Upstream protection is correct and unobstructed.

9. Inspect Battery and Contacts

Action: Check battery housing, latch, contacts, charge, age/history, swelling, leakage, heat damage, cracks, and contamination; confirm blower/charger compatibility.

Expected outcome: The correct battery is undamaged, secure, and charged.

10. Inspect Charger

Action: Inspect the approved charger, power supply, cord, plug, bays, contacts, indicators, and ventilation. Confirm normal indication with the exact battery.

Expected outcome: Charger is intact, compatible, and functional.

11. Inspect Belt and Attachments

Action: Check belt, buckles, straps, mounting points, fasteners, pad, and harness for cuts, chemical damage, elasticity loss, deformation, or insecure attachment.

Expected outcome: Blower support and adjustment hardware hold securely.

12. Inspect Breathing Tube

Action: Flex and inspect the tube, cuffs, threads, seals, swivels, and connections for holes, cuts, kinks, wear, contamination, blockage, or looseness.

Expected outcome: Tube is clean, dry, unobstructed, airtight, and secure.

13. Inspect Headgear and Air Path

Action: Per separate instructions, inspect hood/helmet, visor, suspension, face seal, shroud, inlet, air channels, exhalation features, and connections.

Expected outcome: Headgear and complete air path are intact and approved.

14. Clean Model-Specifically

Action: Wipe the TR-300/TR-300+ blower and battery; never immerse them. For TR-600, use only permitted methods and TR-653 plugs whenever required. Never use solvents, abrasives, compressed air, or vacuum inside the blower.

Expected outcome: Parts are clean without intrusion or chemical damage.

15. Dry and Reassemble

Action: Completely dry all parts, especially tube interiors and contacts. Install the correct filter, options, cover, battery, belt, tube, and headgear; tug-check connections.

Expected outcome: System is dry, complete, and secure.

16. Verify Startup and Indicators

Action: Start and stabilize the blower per exact instructions. Confirm normal sound, airflow selection where fitted, battery/filter indications, and no active alarm.

Expected outcome: Startup and normal indication pass.

17. Perform the Model-Specific Airflow Check

Action: Use the correct indicator, orientation, seal, temperature/elevation method, stabilization time, and minimum mark. For legacy TR-300, run one minute and hold TR-970 vertically; the ball bottom must be at or above the minimum mark.

Expected outcome: Airflow meets the model-specific minimum.

18. Test the Low-Flow Alarm

Action: Perform the exact model's prescribed outlet-restriction simulation. Confirm motor response and audible/visual alarms occur in the specified sequence/time and clear after restriction removal.

Expected outcome: Both alarm indications activate and reset correctly.

19. Complete Battery and Infrequent-Use Maintenance

Action: Recharge after use and follow exact storage/recharge instructions. Remove the battery for long-term storage when directed. If a TR-300 blower is not regularly used, document a five-minute annual run.

Expected outcome: Battery and storage maintenance are current.

20. Final Inspection, Storage, and Documentation

Action: Repeat assembly/function checks, confirm no alarm, and store clean/dry within permitted conditions. Record components, results, cleaning, replacements, and disposition.

Expected outcome: The PAPR is documented, protected, and ready for controlled issue.

Electrical Safety Testing

Routine biomedical ground-resistance and leakage-current testing is not manufacturer-listed for these battery-powered PAPR assemblies. Inspect the external charger/power supply only as directed by its instructions and facility policy. Do not invent limits or perform unauthorized internal tests.

Pass / Fail Criteria

Pass

Remove From Service

Copy/Paste CMMS Work Order Procedure

Use current 3M instructions for the exact blower and every component. Never use a PAPR that fails airflow or alarm testing, never clean filter media, and never immerse a TR-300/TR-300+ blower or battery.

Sources