Smiths Medical Level 1 Series H-1000 / H-1200

Preventive Maintenance Procedure

On this page

Asset Type

Fluid & Blood Warmer

Manufacturer

Smiths Medical

Model

Level 1 Series H-1000 / H-1200

Manual Reference

Level 1 H-1200 Operator's Manual P/N 4533708GB Rev. 008; H-1000 Operator's and Service Manual P/N 4533801 Rev. 001; current ICU Medical guidance.

Manufacturer Recommendation / AEM Status

Clean and inspect before every use; lubricate O-rings and replace distilled water every 30 days; annually disinfect/service the reservoir, replace O-rings, clean the fan filter, inspect options, and perform alarm, performance, calibration, and electrical-safety tests. When using 0.3% hydrogen-peroxide/distilled-water solution, replace it every 12 months and top off with the same solution. H-31 air detector/clamp and H-2 pressure-chamber checks apply only when fitted.

Changes belong under the facility's approved AEM program, risk assessment, maintenance history, and applicable requirements.

What This PM Procedure Covers

Required Tools and Equipment

Step-by-Step PM Procedure

1. Verify Identity and Configuration

Action: Record asset, H-1000/H-1200, serial, voltage, H-2/H-31B options, disposable family, and manual.

Expected outcome: Requirements match the unit.

2. Review History

Action: Review heat, alarms, temperature, leaks, flow, detector/clamp, chambers, reservoir, safety, and repairs.

Expected outcome: Risks are known.

3. Remove From Use

Action: Tag out, remove disposables, unplug/cool/depressurize, and follow contamination policy.

Expected outcome: Burn, pressure, shock, and biohazards are controlled.

4. Clean Exterior

Action: Clean after use with approved mild detergent, water, soft cloth, and disinfection method; prevent ingress and dry.

Expected outcome: Surfaces are clean and intact.

5. General Inspection

Action: Inspect enclosure, pole clamp, feet, handles, labels, display, controls, fill port, drain, tubing, cables, and fasteners.

Expected outcome: Structure is complete; damaged units are removed.

6. Inspect Power Components

Action: Inspect cord, plug, ground pin, inlet, strain relief, protection, and accessible connectors.

Expected outcome: Mains and ground parts are intact.

7. Inspect Sockets and O-Rings

Action: Check sockets/seals for cuts, flattening, dryness, swelling, contamination, leakage, or difficult insertion.

Expected outcome: Seals are intact and seat smoothly.

8. Complete 30-Day Lubrication

Action: Apply a small amount of specified silicone grease around each O-ring without unnecessary disassembly.

Expected outcome: Seals are lightly/evenly lubricated.

9. Service Recirculating Solution

Action: Replace distilled water every 30 days, or maintain/top off 0.3% solution with the same mixture and replace annually.

Expected outcome: Correct solution and level are documented.

10. Complete Annual Reservoir Disinfection

Action: Follow exact drain/fill/circulation/dwell/refill steps using 1.4 L of 0.3% solution: 140 mL 3% hydrogen peroxide plus 1,260 mL distilled water.

Expected outcome: Annual protocol is complete.

11. Replace O-Rings Annually

Action: Replace specified O-rings, lubricate, seat fully, and leak-check.

Expected outcome: New seals are correctly installed.

12. Clean Fan Filter Annually

Action: Remove/clean/dry/reinstall the filter and inspect guard/air path.

Expected outcome: Cooling airflow is unobstructed.

13. Inspect H-2 Pressure Chambers

Action: If fitted, inspect chambers, latches, hinges, connections, controls, and operation.

Expected outcome: Chambers are secure and functional.

14. Inspect H-31B Air Detector/Clamp

Action: If fitted, inspect detector, clamp, cable, connector, action, indicators, and disposable seating.

Expected outcome: Detector/clamp is clean, aligned, and functional.

15. Test Add-Water and Disposable Alarms

Action: Perform manual-prescribed alarm simulations and recovery.

Expected outcome: Audible/visual alarms activate and clear.

16. Test Detector/Clamp and Alarm Output

Action: If fitted, test air detection, clamp action, and Fluid Warmer Alarm Signal output.

Expected outcome: Air hazard stops flow and signals correctly.

17. Test Overtemperature Protection

Action: Perform only the controlled manual procedure; never improvise heating.

Expected outcome: Heat interrupts and alarm/indication passes.

18. Perform Cold-Start and Performance Tests

Action: With approved test setup, verify circulation, warm-up, flow path, controls, indicators, and stable operation.

Expected outcome: Performance passes without leak/fault.

19. Verify Calibration and Electrical Safety

Action: Use TCW 80-03-002/approved setup; display must be within 0.3°C of reference. Test earth leakage with heater fully on and ground continuity.

Expected outcome: Calibration and safety pass.

20. Restore and Document

Action: Remove test set, restore solution/options, clean/dry, repeat readiness, label, and document values/parts/status.

Expected outcome: Unit is complete and ready or removed.

Electrical Safety Testing

Perform earth leakage with the immersion-heater circuit fully on and ground continuity per current manual/standard. Record analyzer/calibration, configuration, leakage conditions/value/limit, ground value/limit, any specifically required dielectric test, and pass/fail.

Pass / Fail Criteria

Pass

Remove From Service

Copy/Paste CMMS Work Order Procedure

Use current model-specific manuals. Never bypass alarms, clamps, temperature protection, grounding, or use an unapproved solution/disposable. Route internal repair to authorized service.