Drager Fabius Anesthesia Machine

Battery / UPS Problems

On this page

Asset Type

Anesthesia Machine

Manufacturer

Drager

Model

Fabius

What This Guide Helps With

This guide addresses situations where the Fabius anesthesia machine reports battery faults, does not hold charge, alarms during power loss, or fails to transition properly to battery/UPS power. The focus is on simple, external, and easily verifiable causes first—such as AC power supply issues, cord problems, outlet problems, or battery age—before assuming internal power supply failure.

Step-by-Step Troubleshooting

Ensure Patient Safety First

Verify AC Power Source

Check Power Indicator Lights

Simulate Power Loss (When Safe and Off Patient)

Check Battery Status Indicators

Consider Battery Age

Inspect for Environmental Factors

Check External UPS (If Used)

If the Problem Persists

If AC supply has been verified, cords are intact, outlets are functional, and battery age or performance indicates failure, the issue is likely internal (battery pack failure, charging circuit issue, or internal power supply malfunction).

Knowing when to stop prevents unnecessary risk and protects patient safety.

Clinical Use Tip

Battery and UPS troubleshooting should never compromise an active case. Always transition the patient to another anesthesia machine or backup ventilation before performing power-related testing. Power instability during anesthesia delivery is a high-risk condition.

Work Order Documentation (CCR Method)

CCR = Complaint, Cause, Resolution

Complaint

What was reported by the clinical staff.

Example:
“Anesthesia machine alarming for low battery and shuts down when unplugged.”

Cause

What was observed during troubleshooting.

Example:
“Battery failed load test. Unit powered off immediately when AC disconnected. Battery age 4+ years.”

Resolution

What action was taken.

Example:
“Replaced internal battery pack. Verified proper charging and confirmed successful transition to battery power during simulated power loss test.”

Helpful Details to Include

Final Thought

Power reliability is critical in anesthesia delivery. Start with external power sources and simple checks before assuming internal failure. Escalate appropriately when battery integrity or charging circuits are in question. Clear documentation ensures traceability and supports patient safety.

That is successful troubleshooting.

Related Guides

Was this guide helpful?

Don't see a guide you need?

Suggest a Guide