Getinge ED-Flow

Air-Purge/Drying Phase Completes but Endoscope Channels Remain Wet

On this page

Asset Type

Endoscope Reprocessor (AER)

Manufacturer

Getinge

Model

ED-Flow

What This Guide Helps With

Troubleshoots residual channel moisture after a completed purge/drying phase, including connection, adapter, airflow-path, loading, and utility-related causes.

Step-by-Step Troubleshooting

1. Protect the Patient and Reprocessing Workflow

Do not release an endoscope for patient use if required reprocessing or drying cannot be verified. Remove the affected scope from the clinical workflow and provide a properly reprocessed replacement.

Do not troubleshoot the ED-Flow while a scope required for immediate patient care depends on the unit.

Expected outcome: Affected scopes are withheld from use until proper reprocessing and drying are confirmed.

2. Confirm the Exact Reported Condition

Determine whether:

Review the completed cycle status without assuming that a completed cycle proves adequate airflow through every connected channel.

Expected outcome: The problem is narrowed to a particular scope, channel, load, or reprocessor condition.

3. Inspect the Endoscope Connection Setup

After the equipment is safe to access, inspect all external channel connections, tubing, connectors, and adapters used for the affected scope.

Look for:

Reconnect questionable connections using the approved setup for the scope being processed.

Expected outcome: Every required channel has an unobstructed, secure connection. If proper connection restores drying, troubleshooting can stop after verification.

4. Verify Scope and Adapter Compatibility

Confirm that the selected scope identification, connector set, and external adapter arrangement correspond to the endoscope being processed.

Do not substitute improvised fittings or alter the channel configuration to force a connection.

If another compatible adapter set is available, compare it with the installed set for visible damage or incorrect assembly.

Expected outcome: The endoscope is connected with the correct, intact external interface.

5. Inspect External Airflow Components

Inspect accessible purge/drying tubing and external airflow components for:

Do not disassemble internal pneumatic components.

Expected outcome: The external purge path is visibly clear and properly connected.

6. Check Loading and Endoscope Positioning

Verify that the endoscope and tubing are positioned without sharp bends, compression, twisting, or dependent loops that could trap fluid.

Confirm that accessories or other items in the chamber are not pressing against tubing or interfering with connections.

Expected outcome: Scope and tubing placement permit unrestricted drainage and airflow.

7. Determine Whether the Problem Follows the Endoscope

When permitted by facility infection-control procedures, compare performance using another compatible endoscope and approved connection set.

If the second scope dries normally, investigate the original scope and its adapter set rather than assuming an ED-Flow failure.

Expected outcome: Testing distinguishes a scope-specific condition from a reprocessor-wide drying problem.

8. Verify Relevant Utilities and Operating Conditions

Confirm that required external utilities are available and that no facility utility work, pressure issue, shutdown, or environmental change coincided with the complaint.

Inspect accessible utility connections for leaks, restrictions, or obvious damage.

Do not alter facility utility regulators or internal pneumatic settings without authorized procedures.

Expected outcome: Required external utilities are available and stable.

9. Repeat a Controlled Functional Cycle

After correcting any connection, positioning, or external airflow issue, run an appropriate controlled cycle with an approved test load or scope according to facility and manufacturer procedures.

Inspect the affected channels at completion using the facility-approved verification method.

Expected outcome: The purge/drying phase completes and the channels are acceptably dry. If confirmed, document the correction and troubleshooting can stop.

10. Remove From Service if Drying Remains Unreliable

If multiple correctly connected compatible scopes remain wet, the drying function cannot be considered reliable.

Remove the ED-Flow from service rather than repeatedly cycling clinical scopes without identifying the cause.

Expected outcome: An unreliable reprocessor is prevented from returning incompletely processed equipment to clinical use.

If the Problem Persists

Common external causes such as incorrect connections, damaged adapters, tubing restriction, scope positioning, scope-specific problems, and obvious utility issues have been ruled out.

The remaining cause may involve an internal pneumatic component, controlled airflow path, valve function, sensor input, configuration issue, or another service-level condition.

The device should be:

After corrective service, complete the required functional and reprocessing verification before returning the ED-Flow to clinical use.

Knowing when to stop external troubleshooting and escalate is proper troubleshooting.

Clinical Use Tip

Never release a scope solely because the cycle reports complete if required channel drying cannot be verified.

Work Order Documentation (CCR Method)

CCR = Complaint, Cause, Resolution

Complaint

What was reported by the clinical staff.

Example:
"Sterile Processing reported that endoscope channels remained wet after the ED-Flow completed the air-purge/drying phase."

Cause

What was observed during troubleshooting.

Example:
"Clinical Engineering found a partially seated channel adapter that restricted purge airflow to the affected scope."

Resolution

What action was taken.

Example:
"Reseated and inspected the adapter connections, completed a controlled cycle, verified proper drying, and returned the ED-Flow to service."

Helpful Details to Include (If Known)

Final Thought

Protect the patient by withholding inadequately dried scopes, verify connections and external airflow before assuming internal failure, perform a controlled final check, escalate unreliable drying, and document the complete finding and resolution clearly.

That is successful troubleshooting.

Related Guides

Was this guide helpful?

Don't see a guide you need?

Suggest a Guide