Getinge ROTAFLOW II

Network, Data Export, or Case Record Failure

On this page

Asset Type

Extracorporeal Membrane Oxygenation (ECMO) System

Manufacturer

Getinge

Model

ROTAFLOW II

What This Guide Helps With

Troubleshoots missing case data, export failures, network connectivity, removable media, external cabling, configuration, and destination-system problems.

Step-by-Step Troubleshooting

1. Protect Patient Support and Separate Data Failure From Therapy

Confirm pump operation, monitoring, and alarms remain available. A documentation or network failure should not interfere with ECMO support.

Provide an approved alternate method for recording required clinical information while troubleshooting.

Expected outcome: Clinical data is documented through an alternate workflow and ECMO support remains unaffected.

2. Confirm the Exact Data Failure

Determine whether the issue involves:

Record any displayed message and the destination involved.

Expected outcome: The failure is narrowed to local recording, export, network transport, or destination-system behavior.

3. Verify Basic Console Operation

Confirm the ROTAFLOW II completes startup normally and can access normal case or data functions.

Do not make undocumented configuration changes to restore connectivity.

Expected outcome: Core console operation is normal and the fault is isolated to data handling or communication.

4. Inspect External Network or Data Connections

If wired connectivity is used, inspect the external cable and connectors for:

Reseat connections when appropriate.

Expected outcome: The physical communication path is intact. If reseating a loose connection restores transfer, proceed to verification.

5. Check the Network Connection Point

Where applicable, verify the wall jack, switch connection, or approved network drop is active using hospital-approved methods.

Compare with a known-good connection when permitted.

Do not connect medical equipment to unauthorized networks.

Expected outcome: The external network path is available to the device.

6. Verify User-Accessible Network and Destination Information

Review the normal accessible configuration information required for communication, such as the selected destination or interface status.

Do not alter IP addressing, integration settings, protected configuration, or security parameters without authorization from the responsible IT or integration team.

Expected outcome: No obvious configuration mismatch is present, or an identified discrepancy is referred to the authorized team for correction.

7. Check Data Export Media When Applicable

If data is exported through approved removable media:

Do not use unknown or unauthorized removable media on clinical equipment.

Expected outcome: Export completes successfully to approved known-good media, or the failure is isolated to the system rather than the original media.

8. Verify the Receiving System

Coordinate with clinical IT or integration support to determine whether:

Expected outcome: A destination or infrastructure outage is distinguished from a ROTAFLOW II device fault.

9. Perform Final Data Verification

After correction, perform an approved test or non-patient record workflow and confirm:

Expected outcome: Data handling is reliable from the source through the intended destination. Troubleshooting can stop.

10. Escalate Persistent Communication or Record Failure

If physical connections, approved media, network availability, and destination status are normal but data transfer or recording still fails, escalate to Getinge service and the appropriate hospital IT or integration team.

Expected outcome: The unresolved issue is assigned to the correct technical group without making unauthorized configuration changes.

If the Problem Persists

External cables, network availability, approved media, destination status, and normal user-accessible settings have been evaluated. Remaining possibilities include internal storage, communication hardware, software, interface configuration, cybersecurity controls, or infrastructure-level integration issues.

The affected device should be:

Coordinate configuration or network changes with authorized IT and integration personnel. After corrective action, verify the complete data path before relying on electronic records.

Knowing when to stop external troubleshooting is proper troubleshooting.

Clinical Use Tip

When ECMO electronic records are unavailable, maintain an approved alternate documentation method so critical pump, flow, pressure, and patient-support information is not lost.

Work Order Documentation (CCR Method)

CCR = Complaint, Cause, Resolution

Complaint

What was reported by the clinical staff.

Example:
"ECMO staff reported the ROTAFLOW II case record would not transfer to the connected network destination after a case."

Cause

What was observed during troubleshooting.

Example:
"Clinical Engineering found the external network cable partially disconnected at the device connection."

Resolution

What action was taken.

Example:
"Reseated the network cable, completed an approved test record transfer to the intended destination, verified normal console operation, and returned the system to service."

Helpful Details to Include (If Known)

Final Thought

Keep ECMO support and documentation continuity intact, verify physical and infrastructure causes before assuming an internal data fault, test the complete communication path, and escalate configuration issues to the appropriate authorized team.

That is successful troubleshooting.

Related Guides

Was this guide helpful?

Don't see a guide you need?

Suggest a Guide