What This Page Explains
This page covers:
- What PM documentation should accomplish
- What belongs in the work order
- What does not
- Pass/fail results
- Actual measurements
- As-found and as-left values
- Test equipment identification
- Parts replaced
- Calibration adjustments
- Software versions
- Failed PM findings
- Follow-up corrective maintenance
- How much detail is enough
- How documentation supports repeat-failure investigation
- Common PM documentation mistakes
The Simple Version
A useful PM record should answer:
What procedure was performed?
What significant results were obtained?
Did anything fail?
Was anything adjusted or replaced?
Was the final condition acceptable?
You do not need to write a novel.
You do need to leave enough evidence that:
PM completed
means something.
Documentation Is Part of the PM
The technical work and the documentation should agree.
If you performed excellent testing but recorded nothing useful, the organization loses much of the value.
Why PM Documentation Matters
A PM record can support:
- Service history
- Trend analysis
- Audits
- Future troubleshooting
It Creates a Baseline
Suppose a device develops:
NIBP inaccurate
six months later.
Previous PM record says:
Static pressure verified within specification across required test points.
That tells you the problem likely developed after that PM.
Weak Documentation
PM done.
What does that tell the next technician?
Almost nothing.
Better Documentation
Completed manufacturer PM procedure. Visual inspection satisfactory. Battery runtime and charge function passed. ECG, SpO2, NIBP, and temperature functions verified. NIBP static pressure and leak tests within specification. Electrical safety testing completed with passing results. No corrective action required.
Now there is substance.
Do You Need Every Measurement in the Narrative?
Not necessarily.
Many CMMS systems contain:
- Structured PM checklist
- Measurement fields
Use those when available.
The narrative should supplement the structured record.
Structured Data Is Valuable
If the CMMS has fields for:
- Battery capacity
- Leakage
record the actual values there.
This makes trending easier.
Actual Measurement vs Pass/Fail
A pass/fail result may be sufficient for some checks.
For others, actual measurement adds significant value.
Example
Battery test:
PASS.
Useful.
But:
Battery capacity 62%.
may become even more useful next year.
Trendable Measurements
Parameters worth recording may include:
- Battery capacity
- Calibration values
- Leakage
- Flow
- Energy
- Pressure
depending on the device and procedure.
Do Not Record Meaningless Precision
If the analyzer is not accurate to:
Six decimal places,
do not document six decimals.
Match the measurement quality.
As-Found Values
An as-found value describes the condition before adjustment.
This can be extremely valuable.
Example
Flow rate required:
100 ±5.
As found:
93.
Adjusted.
As left:
100.
If you record only:
Passed after calibration
you lose the fact that the device arrived out of tolerance.
Why As-Found Matters
Repeated as-found failures may reveal:
- Drift
- Wear
- Unstable sensor
As-Left Values
As-left results show the final condition after:
- Adjustment
- Repair
Calibration Documentation
If calibration was adjusted, document that clearly.
Example:
NIBP pressure calibration adjusted per manufacturer procedure. Verified all required pressure points within specification after adjustment.
Do Not Hide the Adjustment
A future technician needs to know the device required correction.
Part Replacement During PM
If you replace:
- Battery
- Filter
- Belt
record it.
Why?
Parts history helps future lifecycle decisions.
Consumables vs Repairs
Some replacements are scheduled maintenance.
Others are corrective discoveries during PM.
Distinguish them when useful.
Example
Replaced annual intake filter per PM procedure.
is different from:
Replaced cooling fan after fan tach test failed during PM.
Failed PM Findings
If an item fails:
Document the failure before fixing it.
Weak
PM passed after repair.
Better
Battery capacity measured 28%, below required limit. Replaced battery and repeated capacity/operation verification with passing results.
Now the record preserves the original finding.
Corrective Work Order
Some organizations create a separate corrective-maintenance work order for failures discovered during PM.
Others document within the same work order.
Follow your facility process.
Make the Relationship Clear
If you open a CM ticket:
Reference it.
That keeps the history connected.
Device Removed From Service
If PM finds a problem serious enough to keep the equipment out of use:
Record that status.
Example
Audible alarm failed during PM. Device removed from service pending speaker repair.
Do not let the work order simply remain:
PM failed.
Test Equipment
Depending on your program, record test equipment used.
This may include:
- Analyzer type
- Asset/serial number
Why Test Equipment Identity Matters
Suppose later your analyzer is found out of calibration.
You may need to identify which medical devices were tested with it.
Traceability
That connection supports the calibration traceability system.
Do Not Invent Analyzer Information
Use the actual equipment.
Procedure Revision
For highly controlled PM programs, the procedure version may matter.
This helps establish:
- What instructions were followed at that time
Software Version
For some devices, recording:
- Firmware
- Application version
during PM can be valuable.
Why?
It creates a historical baseline for:
- Software recalls
- Cybersecurity
- Compatibility
Do Not Fill the CMMS With Data Nobody Will Ever Use
Documentation should be useful.
The goal is not maximal text.
The goal is useful evidence.
PM Notes Should Reflect What Actually Happened
Do not use a boilerplate statement claiming:
All functions tested
if you did not actually test all functions.
Templates Can Help
A standard template improves consistency.
But templates become dangerous when technicians click through without verifying the content.
Never Document a Test You Did Not Perform
This sounds obvious.
It is one of the most important rules in technical documentation.
Pass/Fail Checkboxes
If you mark:
PASS,
you are asserting that the item met the applicable requirement.
Make sure you know what that requirement is.
“N/A”
Use N/A intentionally.
It should mean:
This item does not apply to this configuration or procedure.
Not:
I did not feel like testing it.
Missing Accessories
Suppose PM requires testing a function but the necessary accessory is not available.
Do not automatically pass it.
Document the limitation and handle according to procedure.
Example
Temperature channel could not be fully verified because required OEM probe was unavailable. Device held pending accessory/test completion.
depending on risk and requirement.
Environmental Conditions
Some calibration procedures require specific:
- Temperature
- Humidity
If relevant, document them.
Not every PM needs this.
Date and Technician Identity
The record should clearly establish:
- When service occurred
- Who performed it
Your CMMS may capture these automatically.
Department and Location
Location can help identify patterns later.
Example
Several devices in one area show the same fluid intrusion.
Without location history, that pattern may be harder to see.
Serial Number Matters
Ensure the PM is closed against:
The correct asset.
Wrong Asset Record
Documenting PM on the wrong asset creates:
- False compliance
- Missing service history
Verify asset identity.
Barcode Scanning
When available, barcode scanning can reduce manual entry errors.
Still verify.
Asset Label Missing
If the asset tag is missing:
Resolve identity before closing the PM.
PM Sticker and CMMS Should Agree
If sticker says:
Due 2027
and CMMS says:
Due 2026,
someone will eventually be confused.
Resolve discrepancies.
Do Not Backdate Improperly
Record the actual service date according to facility policy.
Due Date
The next due date should follow:
- Approved interval
not personal preference.
Documentation of Failed Inspection
Example:
Rear enclosure cracked near mounting point.
Do not simply write:
Cosmetic damage
unless you have actually determined its significance.
Be Objective
Describe what you observe.
Avoid Blame
Weak:
Nursing destroyed cord.
Better:
Power cord insulation cut approximately 3 cm from device strain relief.
Facts are more useful.
Avoid Guessing Root Cause
Weak:
Battery failed because staff leaves it unplugged.
unless that is supported.
Better:
Battery capacity below specification. Cause of early degradation not established.
Separate Fact From Interpretation
This makes records stronger.
Good PM Documentation Helps Future Troubleshooting
Suppose current complaint:
Ventilator overheating.
Last two PM notes show:
Filter heavily loaded.
Now environmental contamination may be relevant.
Another Example
Battery currently fails.
Previous PM:
Capacity 55%.
The degradation was already visible.
Trend Analysis
Good PM records can help identify:
- Fleet problems
- Model weaknesses
Example
Ten devices repeatedly require the same calibration adjustment.
That may justify deeper investigation.
PM Documentation Helps Capital Planning
Repeated:
- Board failures
- Battery failures
can support replacement decisions.
Vendor Communication
If you escalate a recurring issue, service history helps the OEM understand:
- Frequency
- Previous actions
Audits
Good records can demonstrate that maintenance is being performed according to the approved program.
But documentation should reflect real technical work, not be written merely for an auditor.
Do Not Let Audit Language Replace Technical Language
Weak:
Performed all required checks in accordance with policy.
Better:
Use the checklist plus meaningful results.
How Much Is Enough?
Enough to answer:
- What was done
- What was found
- What changed
- What was the final condition
You Do Not Need a Paragraph for Every PM
Routine pass:
Can be concise.
Example
Completed manufacturer PM procedure. Visual inspection and functional testing satisfactory. Battery, alarms, and applicable performance tests within specification. No corrective action required.
That may be plenty if detailed measurements are stored elsewhere.
PM With Findings
Needs more detail.
Example:
PM identified NIBP leak rate above specification. Internal tubing connection found loose and reseated. Repeated leak, static pressure, and functional tests within specification. All remaining PM checks passed.
That tells the real story.
PM With Failed Battery
Battery capacity measured 34%, below required acceptance limit. Replaced battery. Verified charging, AC/battery transition, and required runtime after replacement. Remaining PM tests passed.
Again:
Clear.
PM With Calibration Adjustment
Temperature input measured +1.8°C outside specification at reference point. Performed calibration adjustment per manufacturer procedure. Verified required temperature points within specification after adjustment. No additional faults noted.
That preserves both:
As-found problem
and:
As-left verification.
Common Mistakes
Writing Only “PM Completed”
You lose technical history.
Recording Only the Final Passing Value
Preserve significant as-found failures.
Marking Everything PASS Automatically
Each pass represents a technical conclusion.
Using Boilerplate That Does Not Match the Work
Documentation must reflect reality.
Failing to Record Parts Replacement
Parts history matters.
Recording a Repair Without Post-Repair Verification
Show that the repair was actually tested.
Putting PM on the Wrong Asset Record
Verify identity.
Writing Unsupported Root Causes
Document facts.
A Useful PM Documentation Framework
Think:
Procedure
What maintenance process was performed?
Condition
What was found?
Measurements
What significant values matter?
Actions
What was adjusted, cleaned, or replaced?
Verification
What testing showed the final condition was acceptable?
Status
Was the device returned to service?
Another Useful Question
Before closing the PM, ask:
If the next technician could see only this work order and not talk to me, would they understand anything important about the device's condition today?
If the answer is no:
Add the missing useful detail.
What Did You Actually Prove?
If your note says:
PM passed,
you are claiming the applicable maintenance requirements were satisfied.
That statement should be supported by:
- Actual inspection
- Actual testing
If a battery failed and was replaced:
Your note should show both:
The failure
and:
The post-repair verification.
Documentation should not claim more than your testing proved.
But it should not hide what your testing discovered either.
Final Thoughts for Biomeds
PM documentation does not need to be long.
It needs to be useful.
Capture:
- What mattered
- What failed
- What changed
- What you verified
The PM record should help the technician who sees the device next year.
It should help the shop recognize a repeat problem.
It should help explain why the device was considered ready to return to service.
The best note is not the longest note.
It is the one that preserves the evidence somebody will actually need later.
So before you hit:
Complete Work Order
ask:
If this device comes back tomorrow, what did I leave behind that will help the next person understand what I found today?
— Jake
Important Note
PM documentation requirements, measurement retention, test-equipment traceability, work-order structure, corrective-maintenance linkage, sticker practices, and maintenance records vary by healthcare organization, CMMS, equipment type, manufacturer, and applicable requirements. Follow your facility's approved documentation practices and record only testing and service actions that were actually performed.